Menu
 

Rail

 

Grange regularly supply concrete and aggregates into the rail sector. We supply structural concrete on a night shift basis when required. We have also supplied low density foamed concrete for bridge stabilisation.

Grange supplied all repair materials for the Lamington viaduct after boxing day floods in 2015, the picture to the right shows the causeway built from Grange Kelhead Armour Stone and sub-base, along with tonne bags of sand, also supplied by Grange to divert the river and create the dam which ultimately created access to the bridge support which had failed.

Below is a small gallery showing some further pictures of this job

Contact Us

 

 

 

 

Services

Services

Sectors

Sectors

Products

Products

Contact us

Contact us
This site uses cookies.

You can read more about our privacy policy here.

Read our privacy policy